Schedule
8:45 am: Sign-in at parking lot, then we’ll walk to the Elk Trail Head together, about 1/2 mile or 15-minute walk.
9 am: Meet at Elk Trail Head for safety talk and team assignments. Hand out t-shirts for new volunteers and take group photo.
9:30-12: Divide into assigned teams and get to work! ⚒️
Noon: Lunch at the Elk Trail Head
12:45-3: Reorganize teams and then it’s back to work ⚒️
3-4 pm: Clean up and organize tools. Deliver to tool shed.
4:30 pm: Planning Meeting (by Invitation)
—
Teams
Build up flagged connector trail (4-6 people)
Leads: TBD
- Applying 4×8 rock and ballast to build up trail surface
- Potentially begin rock sand capping
Rock work at Song Sparrow Bridge (2-4 people)
Lead : Jenny
- Finish rock work on east side of bridge
- Collaborate with restoration team to decommission contractor’s access trail
Power Carrier Drivers (4)
Lead : Kip
- Carry rock and gravel from the Elk Trail Head to our 2 work sites.
Restoration Crew (Everybody else)
Lead: Ellie & Zoe
- Restoration work under and near Song Sparrow Bridge
- Relocate log rounds, ready soil under bridge for wildflower and grass planting
- Naturalize completed rock work
- Fill “Rock Garden Triangle” with organic material to ready for wildflower planting
- Decommission contractor’s access trail, transplant ferns, ready for planting