This 7th session for 2019, on September 14th, was very productive. Seven (7) volunteers moved a lot of rock, building rock walls and trail tread.
Regaining momentum after our Summer breaks always takes time…
This 7th session for 2019, on September 14th, was very productive. Seven (7) volunteers moved a lot of rock, building rock walls and trail tread.
Regaining momentum after our Summer breaks always takes time…
You must be logged in to post a comment.